Posted in | News | Aerospace Materials

Boeing Commence 787 Dreamliner Static Test

Boeing moved the 787 Dreamliner static test airframe from its Final Assembly facility in Everett to its structural test rig this evening. The test rig is located only 1,000 feet away from Final Assembly at the Everett factory.

787 Dreamliner Static Test Airframe Moving to Testing Facility

Some assembly remains to be completed on the static airframe. That work will be completed concurrently with test set-up. Test set up is expected to begin immediately, with tests commencing this summer.

"During static tests we apply loads to the airplane structure that simulate both normal operation as well as extreme flight conditions," said Randy Harley, vice president of Engineering & Technology for the 787 program. "We monitor the airplane to confirm analytical predictions and make sure the structure holds up to these conditions."

Movement of the static airframe clears the way to begin assembly of the third 787 to enter the flight test program. Most pieces of the third airplane arrived in Everett earlier this month. All assemblies for Airplane #3 are now in Everett, and the airplane will be loaded into the first position of Final Assembly early next week.

Posted April 27th,2008

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.