Breakthrough Fire Protection Coating Accelerates Project Completion with Highest Levels of Durability

Sherwin-Williams Protective & Marine Coatings has developed its new FIRETEX® FX6002 intumescent passive fire protection (PFP) coating to provide developers and fabricators across Europe unprecedented speed of curing and dry handling times with the highest levels of protection in the event of a fire.

The unrivalled features of FIRETEX® FX6002 - based on a proprietary reactive binder unique in this market sector - give PFP applicators a drying time of one hour and can be used without a primer or top coat in most environments without losing the highest levels of durability.

The ultra-fast drying characteristics result in faster overall project completion and cost reduction, and provide up to 120 minutes fire protection and long-term corrosion protection to the steelwork.

“This coating has been rigorously fire tested under the requirements of European fire testing standard EN13381-8 & 9 and British standard BS 476-20 & 21 for structural steelwork and cellular beams,’’ said Roger Williams, Market Director-FIRETEX, EMEAI & APAC at Sherwin-Williams Protective & Marine.

“In addition to the enhanced stability for steel structures that this patented technology delivers in the event of a fire, applicators can now transport steelwork within hours compared to days for conventional water-based, solvent-based and epoxy-based products,” added Williams.

In-shop applicators of intumescent fire protection can benefit from the 92-percent volume solids composition of FX6002, resulting in low levels of Volatile Organic Content (VOC) comparable with many of today’s water-based intumescent products. The product also dries to leave a smooth, highly aesthetic finish.

Projects using fire protection coatings delivered by Sherwin-Williams in EMEAI include London’s The Shard, Azerbaijan’s Flame Towers and the Leadenhall Building, known as The Cheesegrater.

Source: http://www.sherwin-williams.com/

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    The Sherwin-Williams Company. (2019, April 08). Breakthrough Fire Protection Coating Accelerates Project Completion with Highest Levels of Durability. AZoM. Retrieved on April 29, 2024 from https://www.azom.com/news.aspx?newsID=50944.

  • MLA

    The Sherwin-Williams Company. "Breakthrough Fire Protection Coating Accelerates Project Completion with Highest Levels of Durability". AZoM. 29 April 2024. <https://www.azom.com/news.aspx?newsID=50944>.

  • Chicago

    The Sherwin-Williams Company. "Breakthrough Fire Protection Coating Accelerates Project Completion with Highest Levels of Durability". AZoM. https://www.azom.com/news.aspx?newsID=50944. (accessed April 29, 2024).

  • Harvard

    The Sherwin-Williams Company. 2019. Breakthrough Fire Protection Coating Accelerates Project Completion with Highest Levels of Durability. AZoM, viewed 29 April 2024, https://www.azom.com/news.aspx?newsID=50944.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.