Software to Shorten Project Time, Increases Quality of Documentation and Improves Project Efficiency

SCITEK Consultants, an aerospace and industrial research and development engineering consultancy, caters for customers in the automotive, defense, and aerospace industries.

The consultancy provides quality turnkey engineering solutions with the help of an experienced design and manufacturing team. Recent projects include the deployment of a Rolls-Royce Gnome helicopter test bed and fabricating custom rigs for spray measurements. SCITEK also delivers numerous products, including flow seeders for laser diagnostics and flow characterization.

EPLAN Solutions at SCITEK Consultants

SCITEK Consultants has been using EPLAN Electric P8 and the EPLAN Data Portal since 2010, when it migrated from Autocad and Solidworks. Since then, the consultancy has witnessed drastic improvements in design efficiency and project turnaround times. When seeking a new software package, SCITEK's key objective was to identify a tool capable of reducing project times, while improving documentation quality and facilitating the efficient management of production resources.

David Varela from SCITEK's Electronics Department informed that productivity improvement was one of the decisive factors in the selection of EPLAN. The company was previously using simple drawing software, but the migration to intelligent software became imperative to save time and improve productivity.

SCITEK selected EPLAN as its design system hoping that it would be flexible to rapidly generating electronic schematics, coupled with engraving drawings for its panels to handle short-term projects. The company also recognized EPLAN to be the best solution for minimizing design times and documenting tasks in long-term projects.

Key Benefits of EPLAN Solutions

Unlike other electrical design packages, EPLAN is database driven. The EPLAN Data Portal provides access to extensive device data and components, including assembly drawings, macros of sub-circuits, and entire user manuals.

According to Varela, the lead time for most research or prototyping projects is between two and six months, during which SCITEK has to design the workflow, device the solution, fabricate it, test it, install it, document it, and often train the users. Since time is the valuable resource, every tool that can assist to manage the process in an efficient manner is providing added value for the company. The savings are proportionately greater for larger projects.

Varela continued that EPLAN supports the project from its first stage involving the development of the structure and the definition of the different zones of the whole system, followed by the drawing of a single line diagram overview for every single subsystem and one depicting the general design, facilitating SCITEK to review and de-bug the solution at an early stage. If the company feels confident, it proceeds to an in-depth version of the drawings, which cater as the company’s manufacturing drawings. If problems occur during machining or wiring, the company can change and re-issue the drawing and continue production without losing much time.

When the system enters the test stage, it is useful to maintain an updated version of the drawings along with all the documentation about the components utilized. EPLAN also allows SCITEK to produces reports with data regarding connectors, cables, and terminals, thereby enabling to trace signals quickly and easily using a summarized terminal block drawing or sheet. When the customers send the project for final acceptance, SCITEK prints a set of drawings to maintain a copy on site for future maintenance.

EPLAN's advanced CAE package has provided SCITEK with the following key benefits:

  • The ability to standardize recurrent content
  • Faster and more-consistent generation of documentation
  • Reduced error count supported by convenient yet efficient error-checking
  • Rapid integration of data corrections and customer-specified changes
  • Ability to transfer electrical design data to enclosure design and manufacturing
  • More accurate production scheduling
  • Improved on-site maintenance documentation

Conclusion

Shortening project lead times and good management of the production resources are the key objectives of SCITEK. EPLAN has enabled SCITEK achieve these objectives. Moreover, the consultancy has witnessed improvements in the standardization of recurrent content and the way of reusing the components. SCITEK is now able to rapidly produce reliable documentation automatically and avoid errors owing to the automatic error-checking feature, thereby enabling the company to integrate data corrections and customer specified changes effectively and rapidly.

This information has been sourced, reviewed and adapted from materials provided by EPLAN.

For more information on this source, please visit EPLAN.

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    EPLAN. (2019, August 26). Software to Shorten Project Time, Increases Quality of Documentation and Improves Project Efficiency. AZoM. Retrieved on April 25, 2024 from https://www.azom.com/article.aspx?ArticleID=10326.

  • MLA

    EPLAN. "Software to Shorten Project Time, Increases Quality of Documentation and Improves Project Efficiency". AZoM. 25 April 2024. <https://www.azom.com/article.aspx?ArticleID=10326>.

  • Chicago

    EPLAN. "Software to Shorten Project Time, Increases Quality of Documentation and Improves Project Efficiency". AZoM. https://www.azom.com/article.aspx?ArticleID=10326. (accessed April 25, 2024).

  • Harvard

    EPLAN. 2019. Software to Shorten Project Time, Increases Quality of Documentation and Improves Project Efficiency. AZoM, viewed 25 April 2024, https://www.azom.com/article.aspx?ArticleID=10326.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this article?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.